Drapper Environmental Consultants Website Banner

WHO NEEDS OUR SERVICES?

Urban Developers, Industry, Mining, Local and State government.

CONCEPTS, PLANNING & APPROVALS

CONCEPTS, PLANNING & APPROVALS

  • Stormwater Management Plans
  • Environmental Management Plans
  • Site Based Environmental Management Plans (SBMP)
  • Environmental Approval (ERA) Applications
  • Lake Water Quality Management Plans
  • Water Balance Optimisation
  • Erosion & Sediment Control Plans (ESCP)
  • Hydrologic & Hydraulic (XP-STORM, MIKE),  Flood Modelling
  • Water quality modeling (MUSIC)
  • Effluent Disposal Modeling (MEDLI)
  • Water Sensitive Urban Design (WUSD)
  • Prototype testing
  • Water quality testing/monitoring
  • Stormwater guideline preparation
DETAILED DESIGN

DETAILED DESIGN

  • Naturalised Channel Design
  • Water Sensitive Urban Design
  • Constructed Wetlands design
  • Floating Wetland Design
  • Bioretention design
  • Rainwater tank design
  • Underground Detention system design
  • Water Sensitive Urban Design Asset Inspection
  • Floating Wetland Design HERE
CONSTRUCTION SUPERVISION & INSPECTION

CONSTRUCTION SUPERVISION & INSPECTION

  • Sediment & erosion control inspections
  • WSUD measure construction supervision
  • Certification
  • Inspection of constructed assets & maintenance inspections
  • Underwater Asset Inspection (UAV)
  • Environmental approval applications
  • Emergency relief structures
  • Environmental licences
  • Environmental authorities
  • Emergency sewer overflow
  • WUSD Asset Condition Assessment

MONITORING & PERFORMANCE EVALUATION

  • Field Monitoring of stormwater & wastewater processes (SQIDEP compliant)
  • Performance monitoring of stormwater devices
  • Water Quality (Stream Health) monitoring
  • Laboratory Evaluation of prototypes for water treatment
  • Stormwater pollution control
  • Laboratory Evaluation of prototypes for water treatment HERE
TRAINING

TRAINING

  • Emergency Sewer Overflow management (WATSOL)
  • How to test to Stormwater Australia’s SQIDEP HERE and HERE.
  • How to program and use an ISCO GLS sampler HERE
WORKPLACE HEALTH & SAFETY

WORKPLACE HEALTH & SAFETY

  • Safe Work Method Statements (SWMS)
  • Risk Assessments
  • Work Procedures
  • Risk Audits
  • WHS Manual preparation
Address4/54 Quilton Place,
Crestmead, QLD 4132

Passionate aboutwhat we do.